1. Preparation before starting
Check whether the connection of each part of the equipment is firm, especially the key parts such as rollers, transmission parts, and electrical systems.
Check whether the oil level of the hydraulic system and lubrication system is normal, and add it in time if necessary.
Clean up the debris around the equipment to ensure that the working area is clean.
Check whether the raw materials meet the requirements and prepare enough raw materials such as plates.
Be familiar with the operation panel and control buttons of the equipment and understand the role of each function.
2. Start-up operation
Close the power switch of the equipment and start the electrical control system.
Start the hydraulic system, transmission system, etc. step by step according to the requirements of the equipment operation manual.
Preheat the equipment and let the equipment run at a low speed for a period of time to ensure that all components work normally.
3. Production operation
Feed the raw material plate into the feed port of the equipment and adjust the feed speed and position.
Set the parameters of roller forming, such as roller pressure, forming speed, etc. according to production requirements.
Observe the operating status of the equipment to ensure that the plate is formed smoothly and accurately during the rolling process.
Check the size, shape and surface quality of the formed rainwater gutter at any time, and adjust the equipment parameters in time if there are any problems.
Keep the working environment around the equipment clean and tidy, and clean up the waste and debris generated during the production process in time.
4. Shutdown operation
Stop the feeding of raw materials, and stop the operation of the equipment after all the plates in the equipment are processed.
Turn off the power of each subsystem such as the hydraulic system and transmission system.
Disconnect the main power switch of the equipment.
Clean and maintain the equipment, clean the dust and debris on the rollers, transmission parts and other parts, and lubricate the key parts.
5. Safety precautions
Operators must undergo professional training and be familiar with the operation methods and safety regulations of the equipment.
During the operation of the equipment, it is strictly forbidden to put hands or other parts of the body into the equipment.
When the equipment fails, stop the operation immediately and notify professional maintenance personnel for maintenance.
Perform safety inspections on the equipment regularly to ensure that the safety protection devices of the equipment are intact and effective.
Strictly abide by the operating procedures of the equipment, and do not change the equipment parameters and operating procedures without authorization.
If you want to know more about the procedures and operation of the rain gutter roll former, please contact J & R Roll Former for more consultation. Our professional team is always on call and willing to listen to your needs and provide you with tailored consultation and guidance.
https://www.jr-rollformingmachine.com/






